详情页

Tianjin Petrochemical completes two major projects

来源: ChemChina Petrochemical
时间:2012-08-22
Tianjin Petrochemical adopts new technologies to save energy and cut costs to bring new vitality to its business and management.

The two major technology reforms and energy saving projects are: air pre-heater in atmospheric furnace and settler stripping section that have already been completed and ready for use.

The technical staff of Tianjin Petrochemical examined the installation quality of the new equipment and installed the tetragonal pyramid on August 10, which was completed on August 14. The equipment is ready for use to play a significant role for the production section in the future.

Contact Us | Site Map | legal | Links | RSS | FAQs
Copyright © 2005-2022  ChemChina Petrochemical Corporation all rights reserved. Without written authorization from ChemChina
Petrochemical Corporation such content shall not be republished or used in any form.